Tuesday 11 December 2012

Editing My input progress



 Monday 17th and Tuesday 18th December 2012
we were going to film extra bits for the music video but our actors went home sick so this could not be done so i started work on our website on wix.


On the 11th December i stayd in media around 3 - 4 hours and created the final muticlip and  started on out provisional edit

then started my section of the editing what was the narrative 



i added effect and lighting to suit the music video 

Monday 10 December 2012

The breakdown


Black line we did not do 
Pink line i did 


pie charts


Alex did do more of the location as i only called but she did visit the locations that we finally went for and characters we did discuss together but she was in more contact with them, i was in more contact with the band as i contacted them constantly on facebook 



module 2 review

Most of what i did is on my blog already 

list below:


Production logo - I did this 




Email to band - I did this 









Brainstorm - Together 



References and inspiration for idea - I did this 



Lyric analysis - Together 
Went though together. I done the first verse and chorus 



Animatic -  Together 
I done the filming/ pictures  and Alex edited 


Location scouting - Together Alex and i looked for different pubs i called up and asked for permission to film  and Alex visited 

Shot list - I did this 


Production Schedule - I did this 

Costumes - Together i looked at the clothing for the band, Alex looked at clothing for actors 




Moodboard for music video effects - i did this 

Inspiration for website and banner - i did this 

Call sheet - Together 
 I collected the Facebook pages and numbers Alex wrote up 



Target audience social network 

Digipak ideas - Together 

Alex done the first 2 and i did the bottom 2 pictures 
Font styles - Together 
I chose the first 3 
Alex chose the bottom 3 
Digipack on photoshop - I did this 


Storyboard - We did this Together


Keeping contact - I did this 



Day 1 and 2 of shoot - Together 
 I took some pictures and alex did 





Narrative edit - I did this 


Tuesday 27 November 2012

Day 1 shooting


photos taken by me 

My 'mini' photoshot of main character at location and location shots 







location 





Monday 26 November 2012

Road to creation my contribution


on the 26th November i stayed in media around 2 - 3 hours and edited and started to put together the narrative scene i added effects and colour correction so that the music video looked more cowboy like. 





i also started to add the multi clip in and done testers of different clips

Thursday 15 November 2012

Keeping contact

To keep in contact with the band and the actors i thought it would be a good idea to set up a facebook page and do group inbox so we can have discussions  and contact each other easier.

Joint conversation with the band 


 conversation with actors


Facebook group